Current site: Peikko Australia. Do you want to change country or language?

Suurstoffi 22, Risch-Rotkreuz, Switzerland

  • Building Type:
  • Office Buildings
Fullscreen map Close

Switzerland's first timber high-rise is called Suurstoffi 22 and is located in Risch-Rotkreuz, Zug.

The structure of the ten-story office building is based on a timber concrete hybrid construction in combination with Peikko DELTABEAM® composite beams.

Due to the building services integrated into the ceiling system, there are several cable ducts in the ceiling beams. cable penetrations. In addition, there are corner areas in the structure where the ceiling span direction changes. The spans there are between 6 and 8.50 meters.

In both cases, the wooden beams provided in the timber concrete composite system would not have had sufficient load-bearing capacity - unless higher dimensions had been chosen, thus calling into question the structural and ultimately the room concept. To solve this problem, DELTABEAM® composite beams from Peikko were used instead of the timber beams in said locations.

 

Planning and construction process

The idea of using steel composite beams instead of wooden beams at named locations was already pursued in the design phase of the project. For an efficient process design, Peikko's development engineers were involved in the planning very early on by their colleagues from the executing timber construction company and suppliers of the TCC elements, respectively. These are characterized by an efficient process design. For example, component planning at Peikko is carried out in 3D based on Tekla software and is compatible with the 3D design drawings of the timber construction engineers. All components were coordinated with each other, the TCC elements were later precast in the factory and - after completion of the concrete core - precisely assembled on site.

The high degree of prefabrication had a positive effect on the construction time - the upper floors were completely erected in only five months.  The erection of one floor (approx. 1750 m2) took around ten days. The assembly of a DELTABEAM® composite beam - in other words, lifting it in by crane and placing and bolting it in place - took around 20 minutes, which corresponds to the standard installation time for such a structural element.

 

Summary

To meet the special requirements of the DELTABEAM® composite girders in combination with timber and concrete composite floors in Suurstoffi 22, it was necessary to install the DELTABEAM® composite girders.

concrete composite slabs, a customized solution was required from the manufacturer. Due to this fact and not least because of its outstanding architectural significance, the object in Risch-Rotkreuz occupies a special position for Peikko.

The complete article on this reference can be found in our German customer magazine Connections [deutsch] 2020

Read more down-arrow.png

Project facts

Floors:
10
Construction Company:
Zug Estates AG
Structural Designer:
MWV Bauingenieure AG | Erne AG
Architect:
Burkard Meyer Architekten BSA AG
Completion year:
2018

Solutions we provided

Contact us

Sascha Schaaf

Sascha Schaaf

Leitung Projektentwicklung

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]